During the heating period of OAO «Kazanskaya teplosetevaya company» provided centralized teplosnabzhenie 4 889 users of Kazani. General extent of thermal networks of OAO «KTK» makes a 1 207 km In a heating period the temperature and hydraulic conditions of the system of teplosnabzheniya were maintained strictly in accordance with the set chart, emergency disconnecting in the thermal networks of OAO «KTK» it was not. The positive role was herein played by that at repair,
reconstruction and capital building of teplovodov modern technologies are used: pipes of teplosnabzheniya in «polyurethane» (PPU) isolations with the embedded system of operativno-distancionnogo production of LTD. control (SODK) «Tatteploizolyaciya» and
polymeric pipes of type «izoprofleks» for the networks of hot water-supply. As a result, notedly the amount of damages of pipelines went down as compared to the heatings periods of past years. In addition, «Kazanskaya teplosetevaya company» conducts opressovki
two times in a year: upon termination of fall-winter period and after completion of repair campaign before the beginning of next heating season.There are specialists of OAO in 2008 "KTK" more than 26 thousand of linear meters of threadbare highway conducted repair and reconstruction
and interblock pipelines of heating and hot water-supply. If necessary the reconstruction of main teplovodov was conducted with the increase of carrying capacity of pipeline. In 2009 of OAO «KTK» planned repair and reconstruction more
35 thousands of linear meters of main and interblock networks. Building of new pipelines will proceed to the objects, built on the program of social mortgage.