Center of management networks «Novgorodenergo» tests the new programmno-tekhnicheskiy complex of CAS of controller’s technological management. Special commission of branch «MRSK of North-west» – «Novgorodenergo» signed an acceptance in installation and check-out phase of a 1 stage of PTK of center of management networks report (CUS). In the system, accepted in installation and check-out phase, vkhodyat:-    subsystem of collection and treatment of information
(CPPS);-    subsystem of operative informative complex (OIK/SKADA);-    system of reflection of technological information (SOTI);-    subsystem of technological local area network of CUS;-    system of the assured power supply
(SEG).- a complex (PTK) is intended for creation of CASS of controller’s and technological management of different complication at all levels of management of elektrosetevykh companies.   A complex allows to create difficult
multilevel systems, to integrate the subsystems of capture of data, pass information in other systems.