Because of the January problems with transportation of gas through Ukraine, have become increasingly important new projects, for example, Nord Stream and Yamal-Europe . Perm Engine Plant is ready to put half of the required gas units.In the early 90′s, in the framework of the integrated program of Ural-Gazprom , OJSC Perm Engine Plant started cooperation with OAO Gazprom . The program has become the largest project in Perm early 90′s and joined almost all the local machine builders. Development and production of land-based gas turbine steel producers Permian gas turbine technology one of the core activities. By 2008, taking a market share of 40%, Perm Engine Company became one of the leading suppliers of gas turbines to drive centrifugal blowers (compressors) gas units. In recent years, favorable conditions of the world gas market contributed to the active development of Gazprom for new deposits of natural gas, develop and modernize their networks gazoprovodov.Na today, the main routes of pipelines from gas fields in Western Siberia to export markets in Western Europe pass through Ukraine (over 80 % of the total export volume of gas). In connection with the January events in Ukraine, improving the reliability issues of energy security and diversification of routes of consumers of Russian blue fuel in Europe are becoming more relevant. OJSC Gazprom is seeking to reduce the risk of problems with gas deliveries in the future and by 2013 plans to start a major new pipeline projects, such as the Nord Stream and Yamal-Europe . Existing pipelines from Russia to Europe would not be able to fully to meet the growing demand for natural gas. One of the major projects to solve this problem and significantly increase the export of Russian gas to EU countries, is building a gas pipeline Nord Stream capacity 55 billion cubic meters of gas a year. In March 2004, the main raw material base for the Nord Stream was identified South-Russian oil and gas field. In the long term to be used as supplementary material to gas fields of Yamal Peninsula, Ob-Tazovskoy lip and the Shtokman field. Russian land of the gas pipeline Nord Stream (COP Gryazovets – COP Port ) a length of 917 kilometers includes 7 compressor stations, among which the COP Port is equipped with a GPA of foreign production unit capacity of more than 30 MW. Productivity of the first stage will be 28 billion cubic meters of gas in god.Dlya output in the pipeline project power Gazprom will require 34 units of gas output of 16 MW and 24 gas power unit 25 MVt.Dolya Russian gas units equipped with gas turbine plant of JSC PMZ , the order of 50%. In 2008, PMZ, through participation in the construction pipeline Nord Stream , entered into contracts for the manufacture of 5 sets GTU-16P for the compressor station Elizavetinskaya and 6-sets GTU-25P for compressor Station Babayevskiy . Yamal gas will be transported in the direction of Bovanenkovo – Ukhta continue in the direction of Ukhta – Gryazovets, Gryazovets – Torzhok. The length of the route of over 2400 km, including a new corridor gazotransportny Bovanenkovo – Ukhta of about 1100 kilometers (design capacity – 140 billion m of gas per year) and a gas pipeline Ukhta – Torzhok length of 1300 km (design capacity – 81.5 billion . m of gas per year). Run the pipeline plan until 2013 goda.Dlya output at full capacity of the pipeline until 2020, Gazprom will require more than 100 units of gas output of 25 MW and 20 units of gas output of 16 MW for the pipeline Bovanenkovo – Ukhta, as well as more than 80 gas output of 25 units MW for the pipeline Ukhta – Gryazovets and about 10 units a capacity of 25 MW for the pipeline Gryazovets – Torzhok.Dolya gas units equipped with gas turbine plant of JSC PMZ the order of 30%. In 2008, OJSC PMZ , within the framework of the project construction of main gas pipeline Bovanenkovo – Ukhta , has entered into contracts for the manufacture of a 7-sets GTU-16P for the compressor station Baydaratskaya and draw up the contract for 5 sets GTU-25P for the compressor station Yarynskaya . In the long run OAO PMZ planned conclusion contracts for the supply of 19-ty sets GTU-16P and 28 sets GTU-25P. As well as the manufacture of stand-5 engines PS-90GP-25, the capacity of 25 MW for the Gazprom .