There is a branch of OAO in a 1 quarter of 2009 «Rusgidro» – «Volzhsk hydroelectric power PLANT» produced 3 040,3 millions kWh electric power or 110% from a plan. Overfulfilment of indexes is related to the folded water resources. Program of repairs, technical rearmament and reconstruction of the hydro-electric power station for period covered executed in full on a lump sum 129,1 millions rub From them on the repair programs a 76,1 million rub is mastered, on works on a technical rearmament and reconstruction
basic equipment is a 53 million rub In a 1 quarter of 2009 in the branch of OAO «Rusgidro» – «Volzhsk hydroelectric power PLANT»  the reconstruction of two hydro-turbines proceeded with the station numbers 3 and 11.  It is new turbines with enhanceable power and more perfect operating
by descriptions. Major repairs of the thyristor systems of excitation of gidrogeneratorov were executed on asms with the station numbers 20, 7 and thyristor bridge 1 SV, permanent repairs of hydroelectric generators, switches 500 kv, air transitions of 500 kv.  In current
period conducted work on renewal of verges of vodoslivnoy weir, to building of transformer workshop on the 11-y section of power house, to the reconstruction of the reserve water system, replacement of equipment of poterny.