From 10 to June, 16, 2009 power unit of Bn-600 worked at the level of power 615 Mvt. Violations of safe exploitation of power unit on the last week, as well as from the beginning of year, were not. The output of radio-activity as rare gases in an atmosphere made less 0,01% from a possible level. Providing of the thermal loadings of users of city over the River carried out by joint work of Beloyarskoy of AES and city boiler room. To June, 15 of Beloyarskaya
AES provided 60% teplosnabzheniya, city boiler room – 40%. To the present tense, in connection with an output in repair of boiler room of promploschadki and heating mains, Beloyarskaya of AES provides 40% hot water supply, city boiler room – 60%. situation in over the River
and district of location of Beloyarskoy of AES corresponded to the level of natural background. A radiation background made in town 5,5 mikrorentgen at o’clock (0,055 mikrozivertov at o’clock), Center of public information of Beloyarskoy of AES reports.