Faucet ship «Azerbaijan» left to the platform «Umid-1», which at the end of 2008 was set on a perspective structure «Umid» in deep-water part of the Azerbaijanian sector of Kaspiya. As Gosneftekompaniya of Azerbaijan (GNKAR) reports, on board a ship is the boring setting weight 65 tons and pedestal for a tower weighing 220 tons.For the previous trips of ship on a platform 8 technological modules, including power-station and 1 dwelling block, were delivered
and a 1 domestic block (block of service) of .v present tense on a platform starting works are conducted, and preparation goes to the wellsites. To that end on a platform pipes are delivered long a 3,5 km and other materials.Reconnaissance mining hole on a depth 6500 meters will bore Management
marine secret service and boring drilling «Bayyl Estuaries». For work on set on a platform «Umid-1» boring setting of the Chinese production and other equipment, borers passed 2-mesyachnuyu preparation on a platform 11 deposits «Gyuneshli».otmetim, that first
for the last 28 years of GNKAR without some extraneous help began mastering of the largest gazokondensatnogo deposit «Umid». It is assumed that soon it will compete with «Gyuneshli», passes 1news.az. «Umid-1» counted on the boring drilling a 6 gas
mining holes in a 6400 m depth