Plan of April on mastering of capital investments on the ground of the built power unit 4 Executed on kalininskoy AES 109 %. Including on an equipment – on 111 %, to buildings and installation works – on 109 %. These information was wired for sound on May, 13 on the 22-m meeting of operative
staff in Udomle. In-process staff from the side of customer took part deputy of director general of OAO «Business concern Energoatom» Dmitry Tveritinov, director of Kalininskoy AES Leonid Martynovchenko, I.o. of deputy of director of Kalininskoy AES on capital building
Alexander Barinov, from the side of general contractor is director Nizhegorodskoy to the engineering company «Atomenergoproekt» Valery Limarenko, director Udomel’skogo branch of OAO «NIAEP» Igor Kruuz. with consideration of current position of businesses on build
to the ground of block 4 the participants of operative staff considered the list of measures on providing of physical defence of object, discussed the plan of financing of building, and also implementation of chart of delivery and  integrations of equipment, primary concerns
on planning and development to ACE TP block 4.rukovoditeli of basic by contract organizations reported about results works in April and about plans on May. So, last month was handed over under concreting the second tier of bioshield of reactor separation, mounted
supporting farm of mine of reactor, editing of wall panels of machine hall (deaerator separation), blochno-nasosnoy stations is complete 4 and t.d.v number of basic thematic tasks of current month adopted concreting of shell of reactor separation to the mark 46.0,
concreting of mine of reactor to the mark 22.30, handing over of coverage under the device of roof of main corps of engine-room, concreting of drawing tower of cooling tower 4 to the mark 43.0.podvodya results of taking place operative staff, Valery Limarenko marked that
tasks on building of block 4 executed on all basic directions, remarks carry working character and not yavlyayuts
– to set an arctic faucet, prepare foundation of turboagregata. Completed 2009 a year must setting of corps of reactor. A build readiness to the leadthrough of these operations must be well-to-do already now».dmitriy Tveritinov named a site area
block 4 One kalininskoy AES of the best. He poblagodaril leaders and personnel of by contract organizations for effective work.Kalininskaya AES is the branch of OAO «Business concern Energoatom», 100% shares of which OAO belongs «Atomenergoprom». The station is located
in the north of the Tverskoy area in Udomel’skom district. In composition the Kalininskoy atomic station three operating power units with vodo-vodyanymi power reactors (Vver-1000) by power 1000 Mvt each. Building of power unit is conducted 4, starting of which is set on
2011 year.