Gosneftekompaniya of Azerbaijan completed a gasket on the marine bottom of two lines of electricity transmissions by an extent in a 1,5 kilometre, that allowed to provide electric power two platforms on a deposit «Oil Stone». As a result of gasket of new line of electricity transmissions were provided with electric power of platform 2415 and 2387, which are located in two kilometres from each other. From these platforms it is in general complication planned to bore 24 mining holes.Produced piling of lines of electricity transmissions
specialized kabeleukladochnoe ship of the Caspian oil navy (to the company GNKAR) «Samir Guliev».novye cables feed from the gas-turbine electric station, located on a deposit «Oil Stone». This station provides electric power
neftegazodobyvayuschie managements «Oil Stone» and «28 May».v present tense ship «Samir Guliev» it is sent on a deposit «Gyuneshli», where it will produce raising and repair of lines of electricity transmissions on a depth 100 meters. During repair of platform on this deposit
will be provided by electric power with the use of spare lines of electricity transmissions, passes Trend Capital.