The plan of workovers of this year is formed on results the teplovizionnogo inspection of equipment with the use of software «TermoCam», which was conducted by the specialists of Chelyabinskikh gorelektrosetey in April, revealed to the portal EnergyLand.info
in the press-centre of OAO «MRSK of Ural». Presently in a regional center permanent repair of equipment of substations is conducted 110 kv «South», «Sporting», «Central» and «Novogradskaya». In particular, in the Central district of Chelyabinska on substation «Sporting», providing a power supply
150 thousand townspeople, repair of equipment of sections is conducted 110 kv, 10 kv, planned tests of power transformers of current and tension 110 kv and interconnect equipment.On substations «Sporting» and «South», being a feed-in center for the habitants of Soviet,
part of the Leninist and Central districts, and also such objects as a hospital of RZHD, public-call long-distance and Chelyabinskiy factory of build travelling machines, work on replacement of maslonapolnennykh high-voltage inputs of oily switches is completed
110 kv on more reliable with a hard isolation. Complete regulation and tuning of mechanisms of switches is conducted, that makes warranty reliable exploitation in future.On substation «Novogradskaya», supplying electric power production objects and zhilischno-bytovoy
sector of north-western district of Chelyabinska, the specialists of CHGES complete work on introduction of new ground-fault neutralizer.In June in the plans of the city electric systems technical maintenance of equipment, including replacement of out-of-date knots, details of equipment,
replacement of inputs, painting of equipment and metallokonstrukciy (in order to avoid corrosion), repair of buildings and buildings, protections and entrance roads, equipping with modern amenities of territory on substation «Central».