LUKOYL completed transport and assembling operations on setting of dwelling structure on the supporting block of marine ledostoykoy of stationary platform (Lsp-2) which enters in the complement of objects of obustroystva of deposit of the name of Yuri As reported already, at the beginning of May a supporting block weighing 1340 tons towed off on a deposit, fastened by 15 piles and geared-up to setting of overhead structure. Transporting of overhead dwelling structure on the point of setting began from Astrakhan of May, 17. In overhead
structure dwellings, public and medical apartments, ship’s galley block, provizionnye pantries, obschesudovye systems and mechanisms, are placed, including a helipad and rescue facilities. A dwelling block is counted on a residence 105 persons. Length of platform 41,5
m, a width is a 40,2 m A height of platform from a sea level is a 38 m Noninteraction – 15 days.A platform is precast on the production of build metallokonstrukciy LTD. «Lukoyl-kaliningradmorneft’» and as otdel’nykhmontazhnykh modules and blocks was delivered
on river barges to Astrakhan of dlyadooborudovaniya and large-sized assembling on the ground of Astrakhan Shipbuilding Production Amalgamation.In future Lsp-2 will be connected by a transitional bridge long a 74,2 m with Lsp-1, intended for the boring drilling, collection, preparation
and transport of oil and gas, setting of which on a deposit is planned on the end of summer of current year.