LUKOYL set the supporting block of ledostoykoy of stationary platform (Lsp-2) which enters in the complement of objects of obustroystva of deposit of the name of Yuri Korchagina in the Caspian sea, reported EnergyLand.info in press-sluzhbe of company. A supporting block weighing 1340 tons by a tug was delivered on the point of setting, filled by water and fastened on the bottom of sea by fifteen piles. In the near time a supporting block will be ready to setting on him of overhead structure of Lsp-2. In an overhead structure Lsp-2 take place
dwellings, public and medical apartments, ship’s galley block, provizionnye pantries, obschesudovye systems and mechanisms, including a helipad and rescue facilities. A dwelling block is counted on a residence 105 persons. Length of platform a 41,5 m, a width is a 40,2 m Height
platforms from a sea level are a 38 m Noninteraction – 15 days. In future Lsp-2 will be connected by a transitional bridge long a 74,2 m with Lsp-1, intended for the boring drilling, collection, preparation and transport of oil and gas, setting of which on a deposit is planned on an end
years of current year. Lsp-2 is precast on the production of build metallokonstrukciy LTD. «Lukoyl-kaliningradmorneft’» and as separate assembling modules and blocks was delivered on river barges to Astrakhan for dooborudovaniya and large-sized assembling
on the ground of Astrakhan Shipbuilding Production Amalgamation. Putting into the operation of deposit of the name of Yuri Korchagina is planned on December, 2009. A deposit is located in a 180 km from Astrakhan and 240 km from Makhachkaly. A sea depth is in the district of deposit
makes 11-13 meters. Supplies of deposit on categories 3 R is estimated in 570 millions barr. A.D. the Maximal level of booty of oil and gas runback makes 2,3 million t/ies and 1,2 milliards of m