The representatives of technical services of branches discussed the questions of diagnostic inspection of elektrosetevogo equipment and modern technologies of his making, reported EnergyLand.info in MRSK of Volga. Opening Scientific and technical advice, director on technical development and exploitation of OAO «MRSK of Volga» Sergey Astaf’ev marked that it is fifth advice which is conducted within the framework of general command of company already. «In connection with a crisis, an investment changed for us
program, to date  the questions of diagnostics of equipment stand on the first place, as the defects exposed in time allow to minimize charges on repair and operating works of equipment», – Sergey Astaf’ev considers. attention was
it is spared to the questions of diagnostics of power transformers, including workings the normative term. Specialists marked that a problem of monitoring of their state was to actual in a plan reliability and timeliness of replacement of threadbare equipment.
 «Presently a question of increase of the productivity of equipment and decline of expenses is to one of most actual, – the deputy of director general of OAO underlined «MRSK of Volga» it is a director of branch «Mordovenergo» Mikhail Dralin. In the near time
it is planned to develop control system by the assets of company which will allow in the conditions of financial crisis to reduce costs on repair of equipment and on the technical rearmament of company»to the .po job of Scientific and technical advice OAO performances «MRSK
Volga»  formed suggestion and recommendation on the increase of efficiency of work in area of diagnostics and repair of electrical equipment, and also optimization of charges on these aims.