In the season of the maximal loading – from November, 01, 2008 for March, 31, 2009 – energoob’ekty branch worked steadily, without failures, that provided the reliable power supply of users of central regions of Russia. Basis of the stable passing of OZP was become by a repair campaign, conducted MES of Center in 2008. During 2008 on substations 220-750 kv MES of Center was repaired 57 avtotransformatorov, 450 groups of switches, 714 groups of disconnectors, 2 095 units of oporno-sterzhnevoy
isolations. On the lines of electricity transmission, being in operating maintenance of MES of Center, 29 500 insulators, 133 km of grozotrosa, are transferable, 2 670 foundations of supports are repaired, 5 235 ga of proseki is cleared. On the repair campaign of MES of Center it was directionally last year
2,3 milliards of roubles.Large attention during preparation to the fall-winter period (OZP) was spared to work with an operative personnel, to in-plant training of specialists. On substations 220-500 kv jointly with subdivisions of MEM MEASURES of Russia, administrations of cities and organs
to executive power of subjects of Russian Federation 36 protivoavariynykh trainings were conducted on working off co-operation at liquidation of malfunctions with violation of power supply of users in the conditions of low temperatures.By a not unimportant factor
successful passing of season of the maximal loadings realization of the having a special purpose programs, directed on the increase of reliability of work of lines of electricity transmission and substations became. In 2008 of MES of Center realized seven having a special purpose programs. In their number is an increase of reliability
oporno-sterzhnevykh insulators, replacement to the porcelain isolation, high-voltage inputs, grozotrosa et al. On realization of the having a special purpose programs about 380 million roubles were directed in 2008.In the first quarter of 2009 in MES of Center a campaign started on repair, reconstruction
and to the technical rearmament of power objects within the framework of makeready in the conditions of winter a maximum of loadings 2009-2010 years.In the area of responsibility of MES of Center territories are included 20 subjects of Russian FEDERATION by a general area 947 thousands apt. km General extent of lines
electricity transmissions on MES of Center are made by a 29 488,4 km In exploitation of MES of Center there are 211 substations 35-750 kv by total power 107 441,8 MVA. The general quantity of personnel of MES of Center makes 2 870 persons.