on April, 15, 2009, in obedience to the chart of repair campaign ratified on a current year, on power unit 3 the middle planned repair began with completion of the 2-go stage of modernization, executable with the purpose of extension of term of exploitation of block. Presently the Leningrad atomic station works as three power units which carry the nominal loading for 1000 Mvt each. Remarks to their work are not present.Making of electric power for two weeks of current month made a 1 milliard 162 million kilowatt-hours, or
115,8% from the April plan.From data of CAS of control radiation situation in the district of location of Leningrad AES and in the 30-kilometrovoy area of supervision does not differ from a natural natural background and corresponds to the long-term values
to the natural radiation for this locality.Leningrad AES is the branch of OAO «Business concern Energoatom», 100% shares of which OAO belongs «Atomenergoprom». The station is located in town Pinery, in a 80 km to the west of Saint Petersburg ashore gulf of Finland.
LAES is the first in a country station with the reactors of Rbmk-1000 (uran-grafitovye nuclear reactors of channel type on thermal neutrons). On AES 4 power units are exploited by electric power 1000 Mvt each.