On the prognosis of Federal service on hydrometeorology and monitoring of environment of GU «Sverdlovsk CGMS-R» (Ekaterinburg), in 2009 the expected volume of flow of spring tide will make 26,0 ± 5 km3 (for comparison in 2008 – 26,6 km3; srednemnogoletnyaya size
– 29,2 km3). The supposed mark of srabotki of Votkinskogo of storage pool is a 85,50 m on the basis of accordion hydrometeorological situation and mode of operations of Votkinskogo of the hydro-electric station, set Rosvodresursami. Mark of filling of Votkinskogo of storage pool – 89,00
m«In connection with wind-induced surge in stvore of Votkinskoy hydroelectric power PLANT there can be a brief increase of level of overhead b’efa to the mark a 89,15 m At deviation of parameters of high water from the concerted chart of admission adjustment of the mode is carried out in operative
order on a concordance with Kamskim by a pool water management and Branch «WITH ECC» ODU Urala», – revealed to the portal EnergyLand.info in OAO «Rusgidro»to .pri work of Kamskoy hydroelectric power PLANT with charges a 3600 m3/p. (in default of single upcasts) Votkinskaya hydroelectric power PLANT works with the expense of water
no less than a 1200 m3/with, filling a storage pool from a mark a 86,0 m a to 88,0 m If prognosis information on the size of maximal inflow of water will be confirmed, after the reach level of storage pool a 88,0 m on Votkinskoy hydroelectric power PLANT single upcasts are possible. At exceeding of prognosis on maximal
to the influx, the charges of water in lower b’ef of the hydroelectric power station can make a 11 000 m3/p. (fact 2008 years – 5157 m3/p.). Intensity of change of single upcasts through the spillway of Votkinskoy hydroelectric power PLANT a 1500 – 2000 m is accepted3/p. in days, and  at the offensive of exceptionally high high water
– no more than 3500 m3/with.At the average daily charges of water through Votkinskiy the hydro-electric station, not exceedings the carrying capacity of hydroelectric generators, hydroelectric power PLANT works with day’s adjusting, and at the charges of water, equal to the carrying capacity of hydroelectric generators (7000 m3/with), hydroelectric power station
works in the base of chart of loading of en
Operativno-dispetcherskoe managing admission of high water through Votkinskiy the hydro-electric station carries out the branch of OAO «SO-EES» ODU Urala.