Places of damages on LEP will define microprocessor devices

May 31st, 2009

MES of Siberia entered in work the modern devices of determining the locations of damage (OMP) on substations 220 kv the Tomsk area. A new equipment, set instead of producing the resource, allows quickly and with high exactness to determine the locations of origin
short circuits on air LEP. (more…)

Fuel from garbage

May 31st, 2009

The Russian specialists developed the project of the plasma processing of hard wastes, which allows not only to avoid harmful extrass but also get komponenty of motor fuel. (more…)

AZS exploded in Novorossiyske

May 31st, 2009

One worker perished and three injured as a result of explosion at the filling station (AZS) in the Seashore district of Novorossiyska on Friday. (more…)

Porcelain is outdated, and a polymer did not deserve a trust: power engineering specialists prefer glass

May 31st, 2009

A repair campaign is opened out in the elektrosetevom economy of grid of Bashkortostana. Traditionally, large work is planned on objects, being in the area of responsibility of LTD. «Bashkir network company». (more…)

In the Daghestan branch of OAO «Rusgidro» inculcate the system «MAXIMO»

May 31st, 2009

In accordance with the program on introduction of management information by funds and assets of enterprise (IC UFAP) «MAXIMO» in the Daghestan branch of OAO «Rusgidro» on the base of the isolated subdivision «Cascade of Sulakskikh hydroelectric power PLANT» a next teaching seminar passed. (more…)

To pass scopes

May 31st, 2009

Nedropol’zovateli will get possibility of change of scopes of the mountain and geological taking, if it will be exposed as a result of dorazvedki, that a deposit goes beyond these scopes or if as a result of geological study of subjacent horizons opened
before unknown bed. (more…)

Orenburgskaya TGK got the certificate of accordance of SMK

May 31st, 2009

A quality management is in subdivisions of the Orenburgskoy teplogeneriruyuschey company – on Sakmarskoy of TEC and in the Orenburgskikh thermal networks – it is also marked certificates. (more…)

Brand – the name is own

May 31st, 2009

Company “TNK-VR Management” went a lawsuit to the arbitrage law of the Saratov area about exacting from individual businessman Chernova v.Yu. 800 thousands of rub of dollar adjustment for the use on his AZS of denotations, similar with commodity signs, belongings
“TNK-VR to Holding”. (more…)

The government of the Krasnoyarskogo edge toughens requirements to gidrostroitelyam

May 31st, 2009

On taking place on May, 28 the extended conference with the representatives of OAO “Rusgidro”, the government of the Krasnoyarskogo edge declared the official position on the projects of the use of gidropotenciala of the Siberian rivers. (more…)

Boguchanskaya hydroelectric power PLANT: where to transmigrate to the people?

May 31st, 2009

? Habitants of village of Keul’ Ust’-ilimskogo district of the Irkutsk area, getting in an area podtopleniya of Boguchanskoy hydroelectric power PLANT, appealed to authorities of region with the opened letter, in which expressed the alarm of nereshennost’yu of vital problems, related to their further fate. (more…)