Repair will last 21 days. Presently in-process there are power units 1 and 3. Their total power is 2010 megawatt. A radiation background on the industrial ground of Smolenskoy AES and adjoining territory did not change and corresponds to the natural natural values.For 15 days of June making of electric power power units of SAES made 976 millions kWh, that more plan of month on
210 million kilowatts of clock of electric power.Only from the beginning of 2009 Smolenskaya AES produced 8 milliards 187 millions kWh electric power, that exceeds the planned indexes on 171 million kWh.Smolenskaya AES is the branch of OAO «Business concern Energoatom», 100% shares of which belongs
OAO «Atomenergoprom». The station is located on the south of the Smolenskoy area, in a 3 km from Desnogorska. SAES consists of three power units with uran-grafitovymi by the channel reactors of type of Rbmk-1000 on thermal neutrons, by general power 3000 megawatt. Power units are put into an operation
in 1982, 1985 and 1990