In the area of responsibility of Timashevskikh of electric networks - branch of OAO «Kuban’energo» during uchebno-trenirovochnogo flight the small airplane of An-2 embedded in the high-voltage line of electricity transmission tension 110 kilovolts. The STATE of emergency became reason of violation of energy supply in ten settlements of Primorsko-akhtarskogo of district.At midday on June, 13 on controller’s point signals acted about disconnecting of oily switches of high-voltage line by tension 110 kilovolts (kv) «Novodzherelievskaya»,
on substation 220 kv «Bryukhoveckaya» and substations 110 kv «Primorsko-akhtarskaya».prichinoy disconnecting falling of airplane of An-2 became, belonging aviacionno-tekhnicheskomu to the sporting club, to being based in Primorsko-akhtarske. A pilot executed uchebno-trenirovochnyy
flight during which an engine said no at an airplane. Not having time smanevrirovat’, a machine fallen down on the high-voltage line of electricity transmission, tore wires, broke support and embedded in  forest bell. An airplane burned out fully, but by a lucky chance  pilot
remained living, injuring a hand only.Investigation of this incident was become by violation of work on a few substations tension 110-35 kv and more than three hundred transformer substations by tension 10/0,4 the kv.bez electric power remained about 16 thousand persons and a few
socially meaningful objects of Primorsko-akhtarskogo of district.Managing OAO «Kuban’energo», driving out into place of falling of airplane, operative measures were accepted on liquidation of violations of energy supply: the charts of connecting of obestochennykh users are developed
on the charts of girdling and leadingout in repair of line 110 kv Primorsko-akhtarskaya-novodzherelievskaya. In the earliest possible dates users were provided with electricity, and power engineering specialists began restoration works.To the site of occurrence drove out immediately
remontno-vosstanovitel’naya brigade, delivery of necessary materials is organized,  transport vehicles and technique. From Leningrad  electric networks on spectransporte high-voltage support was delivered.Renewal of el
right after the receipt of permission to the commission of inquiry. The broken support was dismantled and taken out on spectransporte, conducted work on editing of armature for setting of new support. After completion  restoration works line of Novodzherelievskaya-primorsko-akhtarskaya
it was plugged in work  on normal  to the chart.