27 years are today carried out from the moment of starting of the first power unit of Abakanskoy of TEC (branch of OAO «Yeniseisk TGK (Tgk-13)»). Over the years an enterprise fastened after itself status of leader of teploenergetiki of Republic of Khakasiya, providing with a heat and energy of habitants and industrial
enterprises of city of Abakan. To the highways of Abakanskoy of TEC more than 90 percents of dwelling fund of the capital of Khakasii are today connected. To the duties of dominant supplier at the market of heat of energy belong responsibly: in  the flow of many years in the apartments of abakancev was not marked substantial
interruptions in teplosnabzhenii. Successes are no less impressive in the field of production of electric power: in 2008 of vyrabotka of electricity made 1 581 872 thousand kW/ch is a maximal amount in all history of Abakanskoy of TEC. Production achievements of labour collective
the stations got a high estimation at federal level. In February present year an enterprise on presentation of government to Khakasii was plugged in a register «All-russian Book of Honour – 2008».s a director general congratulated the memorable date of abakanskikh power engineering specialists
OAO «Yeniseisk TGK (Tgk-13)» Vladimir Bogomazov. In congratulation he expressed a confidence in further development of enterprise and wished to the power engineering specialists of successes in-process.