JOINT-STOCK COMPANY «E 4-sibkotes» (Group of E4) got the positive conclusion of state examination on a project «Expansion of Novgorod TEC the gas-turbine setting of Gte-160 with steam kotlom-utilizatorom, working on an existent turbine Pt-60-130/13». By the supplier of gas turbine by single power 160 Mvt with the generator of T 3 Fg-160-2MU 3 will come forward to OAO «Power machines», steam dvukhkonturnogo kotla-utilizatora type of P-137 paroproizvoditel’nost’yu 223 t/ch – OAO IK «ZIOMAR». As a basic and reserve fuel accepted
natural gas.Presently in accordance with a project E 4-sibkotes at the station construction-works are conducted. OAO comes forward the general contractor of building of setting «Novgorodenergoservis». Putting into the operation of new power unit will allow practically
in two times to increase the set electric power of the station: the requirement of Great Novgorod in electric power will be satisfied fully, Novgorod area – on 70 percents. Expansion of the station is conducted within the framework of strategy of development of OAO «Tgk-2». Starting
new equipment set on 2010.