On being in 18.06.2009 a water level in overhead b’efe of Votkinskogo of storage pool makes a 88,88 m, in nizhnem are a 66,67 m The existent volume of supply of water, at the optimum use of resources Kama, will provide possibility effectively to work to all vodopol’zovatelyam. A permskiy center on gidrometereologii and monitoring of environment (Permskiy CGMS) declared completion of spring tide 2009 years for Votkinskogo of the hydro-electric station, revealed to the portal EnergyLand.info in press-sluzhbe of OAO "Rusgidro". A spring tide was this year
middle on a hydraulicity and lasted 75 days (in 2008 this period made 69 days). Maximal volume of influx to stvoru of Votkinskoy hydroelectric power PLANT was fixed 22 May, 2009 and made 7787 cubic meters of water in a second.In the period of spring tide 2009 on Votkinskoy hydroelectric power PLANT single
upcasts not produced, all acting water had been used for making of electric power. The average daily making of electric power of the station in the period of peak of high water made about 20 million kWh. Total making of electric power for all period of high water
– 827,2 млн.кВтч. С начала половодья (02.04.2009) до конца апреля она составила 212,0 млн. кВтч, за май – 388,2 млн. кВтч, с начала июня до завершения половодья (15.06.2009) – 227,0 млн. кВтч. Максимальная отметка уровня воды в нижнем бьефе была зафиксирована 29 мая 2009 г. (70,9
m); in overhead b’efe – 5 June, 2009 (89,01 ) .odnoy from basic tasks in-process the hydroelectric power station in the period of spring flood there was filling of storage pool to the normal podpornogo level (NPU), that will allow hydroelectric power PLANT to work in the normal mode to the next year.
Chaykovskie hydroenergetics managed with this task.