Agency for Atomic Energy of Turkey (TAEK) has begun to analyze the commercial proposal of the Russian-Turkish consortium (CJSC Atomstroyexport, Inter RAO UES and the Turkish company “Park Technique) in the tender for the construction of nuclear power plants.At the same time, a Turkish company Tetash of the Consortium were transferred to a new business proposal, adjusted in the light of the current situation in the world market. According to the analysis in the near future will be prepared a report for the Cabinet of Ministers of Turkey for the final decision. The first nuclear power plant in Turkey to be built near the Mediterranean port of Mersin (District Akkuyu). Tenders Consortium includes the construction of four reactors of the VVER 1200 MW capacity of the Russian project NPP-2006. ” In the first stage of the tender, which took place in late September 2008, was attended by 13 leading companies in the world, but the Russian-Turkish consortium was the only party that submitted on time with a package of necessary documents. Agency for Atomic Energy of Turkey (TAEK) within a half months has been careful analysis of the package with the technical documentation, and has taken a policy decision on the desirability and feasibility studies of these under Russian draft of the international requirements of the safe operation of nuclear power plants.