On Verkhnetagil’skoy GRES within the framework of measures on admission of spring flood drainage devices and pumping facilities are resulted in an order; the revision of pumping equipment and livnestokov is produced on the roof of buildings and buildings. On the period of flood the brigades of workers are formed for avariyno-vosstanovitel’nykh and rescue works, a round-the-clock duty and looking after the level of water is set in the storage pools of Verkhnetagil’skoy Gres.Osoboe attention is spared to cleaning of wells by industrial
to the sewage system on ter-ritorii promploschadki of the station and breech-blocks of Tagil’skogo and Vogul’skogo of the hydro-electric stations from snow and ice. A flood commission supports permanent operative connection with local subdivision of MEM MEASURES of Russia for timely prevention of emergency
si-tuaciy. «The specialists of the station round-the-clock watch the level of prudov-okhladiteley on the control points of Vogul’skogo, Tagil’skogo of ponds and zoloshlakootvala Gzu-2, – the deputy of main engineer tells on exploitation and operativ-nomu management
by the production of Verkhnetagil’skoy GRES Yuri Yur’ev. – Duration of flood period depends, foremost, from external sre-dy are sinking, melting of snows. We watch a situation operatively, and regulate water of ponds levels in good time».